💬 📞

Maharashtra's Most Trusted
Solar EPC Company

Residential, Commercial & Industrial Solar Rooftop installations. 13+ Years of Experience, 500+ Projects Completed successfully across Maharashtra.

MSME Registered MNRE Approved Installer Tier-1 Panels Only Net Metering Experts PM Surya Ghar Assistance Industrial Solar Specialists 580kW Projects Completed Kolhapur District Based MSME Registered MNRE Approved Installer Tier-1 Panels Only Net Metering Experts PM Surya Ghar Assistance Industrial Solar Specialists 580kW Projects Completed Kolhapur District Based
What We Do

Complete Solar EPC Services
in Maharashtra

From rooftop residential systems to multi-megawatt industrial plants — we handle everything from design to net metering to annual maintenance.

🏠
Residential Rooftop Solar
Reduce electricity bill by 70–90%. Subsidy up to ₹78,000 under PM Surya Ghar Yojana for Maharashtra homes.
🏢
Commercial Solar EPC
Custom solar for offices, schools, hospitals, malls. 4–5 year payback. On-grid and hybrid options.
🏭
Industrial Solar Plants
100kW to 5MW solar EPC for factories, textile mills, manufacturing plants. Maharashtra's proven industrial solar expert.
On-Grid Solar + Net Metering
Export surplus power to MSEDCL grid. Reduce per-unit electricity cost to near zero. Subsidy eligible.
🔆
Off-Grid Solar Systems
Independent solar power for remote locations, farms, and areas with frequent outages. Zero electricity bills.
🔋
Hybrid Solar + Battery
Solar + battery storage for 24×7 uninterrupted power. Best for businesses with critical loads and frequent cuts.
📋
Net Metering Assistance
Complete MSEDCL net metering application, documentation, inspection and approval support — handled by us.
🔧
Solar O&M & AMC Services
Annual Maintenance Contracts — panel cleaning, inverter health check, performance monitoring and rapid response.
Solar Solutions

Solar Systems for Every Need —
Home to Heavy Industry

Whether you're a homeowner wanting to cut bills or a factory owner saving crores — we have the right system.

🏠
Residential Solar
1kW – 10kW
Homes, apartments, housing societies. Save ₹1,500–₹10,000/month. Subsidy up to ₹78,000.
🏢
Commercial Solar
10kW – 500kW
Shops, offices, schools, hospitals. 4–5 year payback. Accelerated depreciation benefit.
🏭
Industrial Solar
500kW – 5MW
Factories, textile mills, cold storage. Save ₹30–₹80 lakh/year. Proven 580kW projects.
🌾
Agricultural Pumps
3HP – 10HP
PM KUSUM scheme. Up to 90% subsidy. Farmer pays only 5–10%. Free irrigation for 25 years.
🔋
Hybrid + Battery
1kW – 100kW
24×7 power. Lithium or lead-acid options. Best for hospitals, factories with critical loads.
Solar Energy Flow Diagram — Sun to Panels to Inverter to Home and Factory
Portfolio

Completed Industrial Solar Projects —
Real Proof from Maharashtra

Real projects. Real clients. Real savings. See why Maharashtra's largest industries trust GVP Solar Energy.

Premium Industrial Solar Installation — Aerial View of Large-Scale Rooftop Solar Plant in Maharashtra

Industrial Solar Excellence — Maharashtra

Large-scale rooftop installations delivering 70–90% electricity cost savings

500+ Projects Completed
250 kW
Bharadiya Group
📍 LocationIchalkaranji
⚙️ TypeIndustrial On-Grid
📅 Payback~5 Years
💰 Annual Saving₹28–35 Lakh/yr
260 kW
Shyam Group
📍 LocationIchalkaranji
⚙️ TypeIndustrial On-Grid
📅 Payback~5 Years
💰 Annual Saving₹29–37 Lakh/yr
400 kW
Maruti Ropes Pvt Ltd
📍 LocationSolapur
⚙️ TypeIndustrial On-Grid
📅 Payback4–5 Years
💰 Annual Saving₹45–55 Lakh/yr
580 kW
Kesare Group
📍 LocationIchalkaranji
⚙️ TypeIndustrial On-Grid
📅 Payback4–5 Years
💰 Annual Saving₹65–80 Lakh/yr
230 kW
Innovation House Industries
📍 LocationAmravati
⚙️ TypeIndustrial On-Grid
📅 Payback~5 Years
💰 Annual Saving₹25–32 Lakh/yr
230 kW
Anand Dhoot
📍 LocationSatyaraj Park, Ichalkaranji
⚙️ TypeIndustrial On-Grid
📅 StatusCompleted
260 kW
Arun Dhoot
📍 LocationSatyaraj Park, Ichalkaranji
⚙️ TypeIndustrial On-Grid
📅 StatusCompleted
300 kW
Rajlaxmi Tex
📍 LocationKATP Park, Tardal
⚙️ TypeIndustrial On-Grid
📅 StatusCompleted
107 kW
Bangad Tex
📍 LocationSatyaraj Park, Ichalkaranji
⚙️ TypeIndustrial On-Grid
📅 StatusCompleted
260 kW
Bohara Tex
📍 LocationMIDC, Kagal
⚙️ TypeIndustrial On-Grid
📅 StatusCompleted
250 kW
Gattani Tex
📍 LocationChandur Road, Ichalkaranji
⚙️ TypeIndustrial On-Grid
📅 StatusCompleted
250 kW
Bharadia Group
📍 LocationSangam Nagar, Hatkanangle
⚙️ TypeIndustrial On-Grid
📅 StatusCompleted
75 kW
Jain Papercone
📍 LocationParwati Industry, Ichalkaranji
⚙️ TypeIndustrial On-Grid
📅 StatusCompleted
335 kW
Mantri Group
📍 LocationKATP Park, Tardal
⚙️ TypeIndustrial On-Grid
📅 StatusCompleted
240 kW
Mansa Group
📍 LocationTardal, Ichalkaranji
⚙️ TypeIndustrial On-Grid
📅 StatusCompleted
110 kW
Vineet Process
📍 LocationMIDC, Kagal
⚙️ TypeIndustrial On-Grid
📅 StatusCompleted
580 kW
Kesare Textile Ind
📍 LocationLaxmi Industry, Korochi
⚙️ TypeIndustrial On-Grid
📅 StatusCompleted
320 kW
Ujjwal Fabrics
📍 LocationIchalkaranji
⚙️ TypeIndustrial On-Grid
📅 StatusCompleted
360 kW
DT Group
📍 LocationKATP Park, Tardal
⚙️ TypeIndustrial On-Grid
📅 StatusCompleted
580 kW
Vineet Process
📍 LocationMIDC, Kagal
⚙️ TypeIndustrial On-Grid
📅 StatusCompleted
110 kW
Shivshakti Process
📍 LocationJawahar Nagar, Ichalkaranji
⚙️ TypeIndustrial On-Grid
📅 StatusCompleted
530 kW
Bharadia Group
📍 LocationSatyaraj Park, Ichalkaranji
⚙️ TypeIndustrial On-Grid
📅 StatusCompleted
200 kW
Radhika Impex
📍 LocationShahapur, Ichalkaranji
⚙️ TypeIndustrial On-Grid
📅 StatusCompleted
400 kW
Maruti Ropes Pvt Ltd
📍 LocationBarshi
⚙️ TypeIndustrial On-Grid
📅 StatusCompleted
230 kW
Innovation House IPL
📍 LocationAmravati
⚙️ TypeIndustrial On-Grid
📅 StatusCompleted
200 kW
Kapil Jaju Industry
📍 LocationShahapur, Ichalkaranji
⚙️ TypeIndustrial On-Grid
📅 StatusCompleted
80 kW
Padmawati
📍 LocationMahasatta Chowk, Ichalkaranji
⚙️ TypeIndustrial On-Grid
📅 StatusCompleted
280 kW
Kismat Group
📍 LocationLaxmi Industry, Korochi
⚙️ TypeIndustrial On-Grid
📅 StatusCompleted
380 kW
Shri Ram Group
📍 LocationKATP Park, Tardal
⚙️ TypeIndustrial On-Grid
📅 StatusCompleted
110 kW
Sanmati Process
📍 LocationSatyaraj Park, Ichalkaranji
⚙️ TypeIndustrial On-Grid
📅 StatusCompleted
510 kW
Sanskar Group
📍 LocationSatyaraj Park, Ichalkaranji
⚙️ TypeIndustrial On-Grid
📅 StatusCompleted
425 kW
Rathi Inani Group
📍 LocationLaxmi Industry, Korochi
⚙️ TypeIndustrial On-Grid
📅 StatusCompleted
270 kW
M M Totala Group
📍 LocationKATP Park, Tardal
⚙️ TypeIndustrial On-Grid
📅 StatusCompleted
600 kW
Kismat Group
📍 LocationLaxmi Industrial Area, Korochi
⚙️ TypeIndustrial On-Grid
📅 StatusCompleted
525 kW
Bhangadia Group
📍 LocationTardal
⚙️ TypeIndustrial On-Grid
📅 StatusCompleted
220 kW
Bhangadia Group
📍 LocationTardal
⚙️ TypeIndustrial On-Grid
📅 StatusCompleted
850 kW
Fibrosa Industry ⭐ Flagship
📍 LocationNavapur, Nandurbar
⚙️ TypeIndustrial On-Grid
📅 StatusCompleted

Are you an industrial client looking to reduce electricity costs?

Get Free Industrial Solar Analysis
Why Choose Us

Why 500+ Clients in Maharashtra
Trust GVP Solar Energy

We don't just install solar — we become your long-term energy partner.

🏆
13+ Years Solar EPC Experience
Operating since 2011 across Maharashtra — deep expertise in residential, commercial and industrial projects.
📍
Kolhapur-Based Local Experts
Office in Ichalkaranji — fastest response time, deep MSEDCL Kolhapur circle knowledge, site surveys in 24 hours.
Industrial Solar Specialists
580kW completed projects — we understand factory load profiles, CEIG approvals and HT metering requirements.
🔩
Tier-1 Panels Only
Waaree, Adani, Vikram, REC — only globally certified Tier-1 panels. No compromise on quality or warranty.
💰
Subsidy Application Experts
PM Surya Ghar, SMART Scheme, PM KUSUM — we handle every step of your subsidy application for free.
📋
Complete EPC — Survey to AMC
Site survey → design → installation → net metering → subsidy → annual maintenance. Nothing is outsourced.
3D Floating Solar Panel — Advanced Monocrystalline Technology
Price Guide 2025

Solar Panel Price in Maharashtra 2025 —
Complete Cost Guide With & Without Subsidy

Solar prices in Maharashtra have dropped significantly in 2025. With PM Surya Ghar subsidy, homeowners can install a quality 3kW system for under ₹1 lakh. Here are exact, real prices — updated for 2025.

🏠 Residential Solar System Price — Before & After Subsidy

SystemMarket PriceGovt SubsidyYour Final CostRoof AreaDaily UnitsMonthly Saving
1 kW₹65,000–₹75,000₹30,000₹35,000–₹45,000~100 sq ft4–5 units₹800–₹1,200
2 kW₹1.20L–₹1.45L₹60,000₹60,000–₹85,000~200 sq ft8–10 units₹1,500–₹2,500
3 kW₹1.70L–₹2.00L₹78,000 (max)₹92,000–₹1.22L~300 sq ft12–15 units₹2,500–₹3,500
5 kW₹2.80L–₹3.20L₹78,000 (capped)₹2.02L–₹2.42L~400 sq ft20–25 units₹4,000–₹6,000
8 kW₹4.50L–₹5.20L₹78,000 (capped)₹3.72L–₹4.42L~550 sq ft32–40 units₹6,500–₹9,000
10 kW₹5.30L–₹6.10L₹78,000 (capped)₹4.52L–₹5.32L~900 sq ft40–50 units₹8,000–₹12,000
💡 Subsidy (max ₹78,000) is credited directly to your bank by the Central Government after installation. Prices are for Kolhapur/Maharashtra region, 2025. Contact GVP Solar Energy for your exact quote: +91-7665165666

🏢 Commercial Solar Price — Maharashtra 2025

SystemMarket PriceAnnual SavingsPayback Period25-Year Net Saving
25 kW₹12L–₹15L₹2.5L–₹3.5L4–5 years₹60L–₹87L
100 kW₹42L–₹52L₹10L–₹14L4–5 years₹2.5Cr–₹3.5Cr
250 kW₹1.0Cr–₹1.3Cr₹25L–₹35L4–5 years₹6Cr–₹8.5Cr
500 kW₹2.0Cr–₹2.5Cr₹50L–₹65L4–5 years₹12Cr–₹16Cr
💡 Commercial systems benefit from 40% accelerated depreciation under Section 32 of Income Tax Act, reducing effective cost by 12–14% in Year 1. GST input credit is also available.
Government Schemes 2025

Solar Subsidy in Maharashtra 2025 —
PM Surya Ghar, SMART Scheme & PM KUSUM

The Maharashtra and Central Government are offering the highest-ever solar subsidies in 2025. Homeowners can save ₹78,000 to ₹1.5 Lakh on installation. GVP Solar handles your entire application — free.

⚠️
IMPORTANT: Subsidies Are First-Come, First-Served PM Surya Ghar subsidies are disbursed until Maharashtra's target is reached — after that, they stop permanently. Apply NOW before funds run out.
Central Government
PM Surya Ghar
Muft Bijli Yojana
Up to ₹78,000
For homeowners & housing societies
1kW–10kW on-grid systems only
300 free units of electricity/month
Implemented via MSEDCL Maharashtra
Subsidy directly to bank account
✅ ACTIVE — Apply Now
Maharashtra State Scheme (Oct 2025)
Maharashtra
SMART Solar Scheme
Up to 95% Off
For BPL, SC/ST, low-income families
BPL families pay as low as ₹2,500
Combines with PM Surya Ghar subsidy
Low consumption (<200 units/month) eligible
Swayampurna Maharashtra initiative
✅ ACTIVE — New Scheme
Central Government — Farmers Only
PM KUSUM
Agricultural Solar
Up to 90% Subsidy
Solar irrigation pumps 3HP–10HP
Farmer pays only 5–10% of cost
Free irrigation for 25 years
MSEDCL agricultural connection needed
Available across all Maharashtra districts
✅ ACTIVE — Apply via MSEDCL

Exact Subsidy Amount — PM Surya Ghar Maharashtra 2025

SystemMarket PriceSubsidyYour Final CostMonthly Savings
1 kW₹65K–₹75K₹30,000₹35K–₹45K₹800–₹1,200
2 kW₹1.20L–₹1.45L₹60,000₹60K–₹85K₹1,500–₹2,500
3 kW₹1.70L–₹2.0L₹78,000 (max)₹92K–₹1.22L₹2,500–₹3,500
5 kW₹2.80L–₹3.20L₹78,000 (capped)₹2.02L–₹2.42L₹4,000–₹6,000
10 kW₹5.30L–₹6.10L₹78,000 (capped)₹4.52L–₹5.32L₹8,000–₹12,000

How to Apply — 6 Simple Steps

01
Call GVP Solar Energy
Our expert visits your home/factory for a free site survey and recommends the right system size.
02
Register on Portal
Register at pmsuryaghar.gov.in with your MSEDCL consumer number. We help fill the form correctly.
03
MSEDCL Approval
MSEDCL sends technical feasibility approval. Typical wait: 7–15 working days. We follow up on your behalf.
04
Solar Installation
GVP installs your complete solar system using MNRE-approved Tier-1 panels. Typical time: 1–3 days.
05
Net Meter Installation
MSEDCL installs bidirectional net meter. We handle all paperwork and MSEDCL coordination.
06
Subsidy in Your Bank
After commissioning, ₹30,000–₹78,000 is directly credited to your bank account within 30–60 days.
🎯 GVP Solar Energy handles all 6 steps for you — completely FREE of charge. We've successfully processed hundreds of subsidy applications across Kolhapur, Solapur and Amravati districts. Call +91-7665165666 →
ROI Calculator

Solar ROI Calculator — Know Your Exact
Savings Before You Invest

Based on real MSEDCL tariff rates and GVP Solar's 500+ completed installations across Maharashtra.

Based on MSEDCL residential tariff ₹8–₹10/unit with 3% annual escalation

Monthly BillBest SystemCost After SubsidyMonthly SavingsPayback25-Year Saving
₹1,000–₹2,0002 kW₹60K–₹85K₹900–₹1,5004–5 years₹3.5L–₹5L
₹2,000–₹3,5003 kW₹92K–₹1.22L₹1,800–₹2,8004–5 years₹5L–₹8L
₹3,500–₹6,0005 kW₹2.02L–₹2.42L₹3,000–₹5,0004–5 years₹9L–₹15L
₹6,000–₹10,0007–8 kW₹3.72L–₹4.42L₹5,000–₹9,0005–6 years₹15L–₹25L
Above ₹10,00010 kW₹4.52L–₹5.32L₹8,000–₹12,0005–6 years₹24L–₹36L

Based on MSEDCL commercial tariff ~₹9/unit + 40% accelerated depreciation

SystemCostAnnual SavingPayback25-Year Saving
25 kW₹12L–₹15L₹2.5L–₹3.5L4–5 yrs₹60L–₹87L
100 kW₹42L–₹52L₹10L–₹14L4–5 yrs₹2.5Cr–₹3.5Cr
500 kW₹2.0Cr–₹2.5Cr₹50L–₹65L4–5 yrs₹12Cr–₹16Cr

Based on HT industrial tariff ₹9.20/unit, FY 2025–26, Maharashtra

SystemCostAnnual SavingPayback25-Year Saving
250 kW₹1.2Cr–₹1.5Cr₹28L–₹35L4–5 yrs₹7Cr–₹8.5Cr
500 kW₹2.2Cr–₹2.7Cr₹55L–₹70L4–5 yrs₹13Cr–₹17Cr
1 MW₹4.15Cr–₹4.5Cr₹1.0Cr–₹1.4Cr3–4 yrs₹26Cr–₹35Cr
2 MW₹8.5Cr–₹9.5Cr₹2.0Cr–₹2.8Cr3–4 yrs₹50Cr–₹70Cr

What happens if you invest ₹3 lakh in solar vs other options — over 25 years?

☀️
5kW Solar (after ₹78K subsidy)
₹9L–₹15L
Saved on bills + ₹2.4L asset value
Risk: ZERO — Guaranteed
🏦
Fixed Deposit (6%)
₹8.6L
Risk: Low
🪙
Gold Investment
₹12L–₹20L
Risk: Medium
📈
Mutual Funds (12% avg)
₹17L
Risk: HIGH — Market dependent
🌟 Solar is the ONLY investment with guaranteed, risk-free returns that are protected from electricity tariff inflation. Your savings automatically grow as MSEDCL tariffs rise every year.
3D Solar ROI Calculator — Gold Premium Calculator with Savings Growth Chart
Industrial Solar

Industrial Solar Plant Installation
in Maharashtra — Cut Costs by 70–90%

Maharashtra HT Industrial Tariff FY 2025–26

₹9.20/unit

A factory consuming 1,00,000 units/month pays ₹1.1 crore/year just on electricity. A 500kW solar plant eliminates 55–70% of that cost permanently.

₹1.80/unit
Solar cost per unit (amortized over 25 years)
₹7.40
Net saving per unit vs grid tariff
300 days
Sunny days/year in Maharashtra
40%
Accelerated depreciation — Income Tax Act Sec 32
CapacityApprox. CostAnnual UnitsAnnual SavingPayback25-Year Net Saving
100 kW₹45L–₹55L1.5 lakh₹10L–₹14L4–5 yrs₹2.5Cr–₹3.5Cr
250 kW₹1.1Cr–₹1.4Cr3.75 lakh₹28L–₹35L4–5 yrs₹7Cr–₹8.5Cr
500 kW₹2.2Cr–₹2.7Cr7.5 lakh₹55L–₹70L4–5 yrs₹13Cr–₹17Cr
1 MW₹4.15Cr–₹4.5Cr15 lakh₹1.0Cr–₹1.4Cr3–4 yrs₹26Cr–₹35Cr
2 MW₹8.5Cr–₹9.5Cr30 lakh₹2.0Cr–₹2.8Cr3–4 yrs₹50Cr–₹70Cr
01
Free Site Assessment
Shadow analysis, roof load check, energy audit of factory load profile.
02
System Design
Capacity, layout, panel/inverter selection customized for your factory's load.
03
All Approvals
MSEDCL, CEIG, Electrical Inspectorate — we handle all regulatory paperwork.
04
Installation & Commissioning
2–6 weeks for 500kW project. Net metering activation + AMC setup.
Get Free Industrial Solar Analysis

Free plant analysis + savings projection report for all industrial enquiries

Service Areas

Solar EPC Services Across Western Maharashtra

Based in Ichalkaranji, we serve all of Kolhapur district and major industrial centres of Western Maharashtra — with fastest response times in our core region.

HQ
🏭
Ichalkaranji
Kolhapur District
  • Head office — fastest response
  • 580kW, 260kW, 250kW projects completed
  • Textile industry solar specialists
  • Site survey within 24 hours
🌆
Kolhapur
Kolhapur District
  • All talukas — Karvir, Hatkanangle, Shirol
  • MSEDCL Kolhapur circle expertise
  • Industrial & commercial solar
  • PM Surya Ghar subsidy assistance
🏗️
Solapur
Solapur District
  • 400kW project — Maruti Ropes Pvt Ltd
  • Textile & manufacturing belt solar
  • Agricultural solar PM KUSUM
  • Free site survey in Solapur
🌾
Sangli
Sangli District
  • Sugar mills & agro industry solar
  • PM KUSUM for farmers
  • Commercial & industrial EPC
  • MSEDCL Sangli net metering
🏭
Amravati
Vidarbha Region
  • 230kW project — Innovation House Industries
  • Vidarbha industrial zone solar
  • Cotton & agro processing solar
  • Highest tariff savings in Vidarbha
🗺️
All Maharashtra
State-Wide Coverage
  • Industrial projects across Maharashtra
  • Large capacity 500kW+ anywhere
  • Contact us for your district
  • Free feasibility report
FAQ

Frequently Asked Questions —
Solar Energy in Maharashtra

Everything you need to know before going solar in Maharashtra — answered by our experts.

What is the cost of a 5kW solar system in Maharashtra in 2025?
+
A 5kW on-grid solar system in Maharashtra costs approximately ₹2.80–₹3.20 lakh before subsidy. After claiming the ₹78,000 PM Surya Ghar subsidy, the final cost is ₹2.02–₹2.42 lakh. This system generates 20–25 units/day and saves ₹4,000–₹6,000 per month on your MSEDCL bill.
What is the maximum solar subsidy I can get in Maharashtra in 2025?
+
Under PM Surya Ghar, maximum subsidy is ₹78,000 (for systems 3kW and above). Under the new Maharashtra SMART Scheme, BPL/SC/ST families can get up to 95% subsidy — paying as little as ₹2,500 for a complete solar system. For farmers, PM KUSUM provides up to 90% subsidy on solar irrigation pumps.
Does GVP Solar Energy handle the PM Surya Ghar subsidy application?
+
Yes — completely and free of charge. GVP Solar Energy manages every step: portal registration on pmsuryaghar.gov.in, document upload, MSEDCL coordination, net meter application, inspection follow-up, and subsidy disbursement tracking. You don't need to visit any office. Call +91-7665165666 to start today.
What is the payback period for industrial solar in Maharashtra?
+
Industrial solar in Maharashtra typically has a payback period of 3–5 years depending on capacity and consumption. With the current HT industrial tariff of ₹9.20/unit and solar cost of ₹1.80–₹2.50/unit amortized over 25 years, the net saving per unit is ₹6.70–₹7.40. A 500kW plant can save ₹55–₹70 lakh annually, paying back in ~4–5 years.
What is the Maharashtra SMART Solar Scheme?
+
The Swayampurna Maharashtra Residential Rooftop Solar (SMART) Scheme was launched in October 2025 by the Maharashtra state government. It provides additional state-level subsidies on top of the Central Government PM Surya Ghar subsidy. BPL and SC/ST families in Maharashtra can get combined subsidies of up to 95%, paying as little as ₹2,500 for a complete 1kW solar system.
What solar panels does GVP Solar Energy use?
+
We use only Tier-1 MNRE-approved solar panels — brands include Waaree, Adani Solar, Vikram Solar, and REC. These are globally certified panels with 25-year performance warranties. We never use cheaper, unbranded panels regardless of cost savings. For inverters, we use Sungrow, Growatt, Delta, and SMA — all with proven service networks in Maharashtra.
Is solar worth it for a home in Kolhapur or Ichalkaranji?
+
Absolutely yes. Maharashtra has 250–300 sunny days/year, MSEDCL residential tariffs are ₹8–₹10/unit, and PM Surya Ghar subsidy reduces upfront cost by ₹30,000–₹78,000. A typical 3kW system in Kolhapur costs ₹92,000–₹1.22 lakh after subsidy, saves ₹2,500–₹3,500/month, and pays back in 4–5 years. Over 25 years, total savings are ₹5–₹8 lakh.
How does net metering work in Maharashtra with MSEDCL?
+
Net metering allows you to export surplus solar power to the MSEDCL grid and receive credit on your electricity bill. MSEDCL installs a bidirectional meter that records both units consumed from the grid and units exported. At billing time, exported units are deducted from consumed units. If exports exceed consumption, credits carry forward. GVP Solar handles the complete MSEDCL net meter application, typically approved in 7–15 working days.
Knowledge Hub

Solar Knowledge Hub —
Expert Guides for Maharashtra

In-depth guides on solar prices, subsidies, net metering and ROI — written by Maharashtra's most experienced solar EPC team.

💡PRICE GUIDE
Solar Panel Price in Maharashtra 2025 — Complete Buyer's Guide
Exact prices for 1kW to 10kW systems with and without PM Surya Ghar subsidy. Updated April 2025.
📋SUBSIDY
PM Surya Ghar Yojana — How to Apply in Maharashtra (Step-by-Step)
Complete application guide for pmsuryaghar.gov.in — documents, MSEDCL process, subsidy timeline.
🏭INDUSTRIAL
Industrial Solar ROI in Maharashtra — How Factories Save ₹1 Crore Per Year
Real ROI calculations for 100kW–2MW plants. Based on ₹9.20/unit HT tariff. Includes tax depreciation analysis.

Get Your FREE Solar Quote — Expert Calls Back in 2 Hours

Tell us your requirement and our solar expert will call you back within 2 hours with a detailed system recommendation and exact price quote.

Free site survey — no charges
No obligation consultation
Expert callback within 2 hours
Complete subsidy application assistance
13+ years experience across Maharashtra

Request Free Solar Quote

Serving Kolhapur, Solapur, Sangli, Amravati & all Maharashtra

Free consultation. No obligation. Expert callback within 2 hours.
Contact Us

Contact GVP Solar Energy —
Free Solar Consultation

Our office is in Ichalkaranji, Kolhapur. We provide free site surveys anywhere in Kolhapur district within 24–48 hours.

📍
Office Address
1-2 First Floor, Building No 1
Kapad Textile Market
Ichalkaranji, Kolhapur, Maharashtra 416115
📞
Phone / WhatsApp
✉️
Email Address
🕒
Working Hours
Monday – Saturday
9:00 AM – 6:00 PM
🗺️
Click to Open Google Maps
Kapad Textile Market, Ichalkaranji

Send Us a Message

We'll get back to you within 2 hours on working days